Class MA permitted development: a practical guide to commercial to residential in England

Class MA permitted development is a national planning right in England that allows a building in Class E (commercial, business and service) use to change to C3 residential use through a prior approval application, rather than a full planning application. It has become one of the main routes for converting shops, offices and other commercial buildings into flats.

10 min readReviewed October 2026 by Matt Lenzie
Bridging calculator

This is a planning guide with a light finance angle. We explain which buildings qualify, the 2-year use requirement, what changed in March 2024, what the council assesses, how long it takes and the risks to weigh before buying. Planning rules are detailed and change over time, so confirm the specifics for your site with a planning consultant before you commit. Class MA applies in England only.

Key takeaways
  • Class MA permitted development allows Class E commercial buildings in England to change to C3 residential through prior approval.
  • The building must have been in Class E use for at least 2 continuous years before the application.
  • From 5 March 2024 the 3-month vacancy requirement and 1,500 square metre floorspace cap were removed.
  • Listed buildings are excluded, some protected areas are restricted, and Article 4 directions can remove the right locally.
  • Confirm the details for your site with a planning consultant before you buy or borrow.
)}

What is Class MA permitted development?

Permitted development rights let certain changes happen without a full planning application, because the principle has already been granted nationally. Class MA covers the change of use from Class E to C3 dwellinghouses. Class E itself, introduced in 2020, groups together uses such as shops, financial and professional services, cafés and restaurants, offices, light industrial uses, gyms and some health and nursery uses.

Class MA is not automatic. You must apply to the local planning authority for prior approval on a defined list of matters, and the council can refuse if those matters are not satisfied. But it cannot refuse on the principle of residential use itself, which is the main advantage over a full application.

Which buildings qualify, and what changed in March 2024?

The core qualifying condition is use history: the building must have been in Class E use for a continuous period of at least 2 years before the prior approval application is made. Evidence such as leases, business rates records and utility bills helps prove this, and gaps or unauthorised uses can cause problems.

Amendments in force from 5 March 2024 widened the right:

ConditionBefore 5 March 2024From 5 March 2024
VacancyBuilding had to be vacant for at least 3 continuous months before applyingVacancy requirement removed
FloorspaceLimited to 1,500 square metres of floorspace changing useFloorspace cap removed
Class E use historyAt least 2 continuous yearsStill at least 2 continuous years

The practical effect is that larger buildings, and buildings that are still let, can now be considered. Larger schemes still face full scrutiny under prior approval, and other conditions continue to apply.

Where does the Class MA right not apply?

Class MA permitted development is excluded or restricted in several situations. In outline:

Check the council's Article 4 directions and the site's designations before you buy. A planning consultant can confirm the position quickly, and it is far cheaper than discovering a restriction after completion.

Have a deal in front of you?Send us the property and the numbers. We will tell you quickly whether it is fundable.

What does the council assess under prior approval?

Prior approval is limited to specific matters. The council cannot consider anything outside them, but it can refuse if the evidence on any of them is inadequate.

Prior approval matterWhat you typically need to show
Transport impactsSafe access, parking and highway effects
ContaminationContamination risks on the site and how they are addressed
FloodingFlood risk, with an assessment where the site is in a flood zone
NoiseImpact of noise from commercial premises on future residents
Natural lightAdequate natural light to all habitable rooms
Fire safetyFire safety impacts, where the building falls within the relevant rules
Loss of certain usesFor example, the impact of losing health centre or registered nursery provision
Conservation areasImpact of losing ground-floor commercial use on the area

Weak noise or light evidence is a common reason for refusal, particularly in mixed commercial streets and deep-plan buildings.

Space standards, natural light and building works

Homes created through permitted development must meet the nationally described space standard, so very small units will not qualify. Every habitable room also needs adequate natural light, which can be difficult in deep office floorplates or ground-floor retail with limited windows.

Class MA covers the change of use, not building works. External alterations, such as new windows, extra storeys or significant changes to the façade, may need separate planning permission. All conversions must also comply with building regulations, covering fire safety, insulation, sound and ventilation.

Plan the layout early with an architect so that units meet the standards. Our guide to light vs heavy refurbishment explains how lenders view the works that follow.

How long does Class MA prior approval take?

  1. Pre-purchase checks: designations, Article 4, use history and a feasibility layout.
  2. Reports: noise, flood, transport, contamination and light assessments as needed.
  3. Application: submitted to the local planning authority with plans and the fee.
  4. Determination: the council has a statutory period to decide, 56 days at the time of writing, and the outcome is approval, approval with conditions, or refusal.
  5. Building regulations and works: once approved, detailed design, building control and construction follow.

Prior approval also comes with a time limit for completing the change of use, so the works programme matters. Because periods, fees and conditions can change, confirm current timescales with your planning consultant before you set a finance term.

Class MA or full planning permission?

Class MA prior approvalFull planning permission
Principle of residential useGranted nationallyAssessed by the council
Scope of assessmentLimited list of mattersFull range of planning policy
External works and extensionsNot includedCan be included
Affordable housing and contributionsGenerally narrowerCan be required by policy
AvailabilityOnly where conditions are met and no Article 4Any site, subject to policy
CertaintyHigher once the conditions are clearly metDepends on local policy and consultation

Some schemes use both: Class MA for the change of use, with a separate planning application for external alterations. A planning consultant can advise on the right route for your building.

Risks to weigh before buying a Class MA building

None of this is legal or planning advice. Take advice from your planning consultant and solicitor on your specific site.

How bridging finance fits a Class MA conversion

Bridging is commonly used to buy a building quickly, before or while prior approval is secured, and then to fund the conversion works.

Offices are the most common Class MA conversions, covered on our office to residential bridging finance page. For shops, pubs and other buildings, see commercial to residential conversion finance.

Unregulated commercial and investment bridging is arranged directly. Any case where the security includes a home you or an immediate family member occupies, including a flat above commercial premises, may be regulated and is introduced to a firm directly authorised by the Financial Conduct Authority. We are not directly authorised by the Financial Conduct Authority ourselves. Your property may be repossessed if you do not keep up repayments on a mortgage or any other debt secured on it.

Good questions, clear answers

Class MA explained: questions answered

Ask about your situation
Does Class MA apply in Wales or Scotland?

No. Class MA permitted development is part of the planning system in England only. Wales and Scotland have their own planning rules for changes of use, and different permitted development rights may or may not apply. Speak to a planning consultant familiar with the relevant nation before relying on any change of use route.

Does the building still need to be vacant for Class MA?

Not since 5 March 2024. Amendments in force from that date removed the earlier requirement for the building to be vacant for 3 continuous months before applying. The requirement for at least 2 continuous years in Class E use still applies, and you will need vacant possession to carry out the conversion works.

Is there still a size limit on Class MA?

The 1,500 square metre floorspace cap was removed by amendments in force from 5 March 2024, so larger buildings can now use Class MA. Larger schemes still need to satisfy every prior approval matter, including transport, noise, natural light and fire safety, and meet space standards.

Can a council refuse a Class MA application?

Yes. The council cannot refuse on the principle of residential use, but it can refuse if the evidence on any prior approval matter, such as noise, natural light, flooding, transport, contamination or fire safety, is not adequate. It can also refuse if the qualifying conditions, such as the 2-year use history, are not met.

Does Class MA cover building works?

No. Class MA permits the change of use only. External alterations such as new windows, extensions or changes to the façade may need separate planning permission, and all works must comply with building regulations. An architect and planning consultant can advise on what your scheme needs.

Can I get a bridging loan for a Class MA conversion?

Yes. Bridging lenders fund purchases with or without prior approval in place, and refurbishment bridges can fund the works. Before approval, lending is usually based on current commercial value. The exit is typically a sale of the flats or a refinance onto longer-term finance.